{"id":27850,"date":"2025-10-07T07:00:13","date_gmt":"2025-10-07T07:00:13","guid":{"rendered":"https:\/\/twproject.com\/blog\/?p=27850"},"modified":"2025-10-07T08:41:12","modified_gmt":"2025-10-07T08:41:12","slug":"checklist-for-starting-a-project","status":"publish","type":"post","link":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/","title":{"rendered":"Checklist for starting a project"},"content":{"rendered":"\n<p><strong>Starting a project<\/strong> correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done on time and within budget.<\/p>\n\n\n\n<p>In this article, you&#8217;ll find a hands-on checklist to ensure every project gets off to a good start and avoids common mistakes or oversights that can mess up the <strong>final result<\/strong>.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"table-of-content\">\n<h5>CONTENT<\/h5>\n<ul>\n<li><a href=\"#10\">The 10 essential steps for successfully starting a project<\/a><\/li>\n<li><a href=\"#goal\">1. Clear goal setting<\/a><\/li>\n<li><a href=\"#stakeholder\">2. Identifying stakeholders<\/a><\/li>\n<li><a href=\"#team\">3. Team composition and responsibilities<\/a><\/li>\n<li><a href=\"#planning\">4. Initial planning<\/a><\/li>\n<li><a href=\"#scope\">5. Scope definition<\/a><\/li>\n<li><a href=\"#how\">How to define the scope effectively<\/a><\/li>\n<li><a href=\"#twp\">How Twproject helps you define and control your scope<\/a><\/li>\n<li><a href=\"#twp\">6. Risk assessment<\/a><\/li>\n<li><a href=\"#document\">7. Initial document preparation<\/a><\/li>\n<li><a href=\"#communication\">8. Communication and alignment<\/a><\/li>\n<li><a href=\"#tool\">9. Working tool setup<\/a><\/li>\n<li><a href=\"#validation\">10. Validation and final approval<\/a><\/li>\n<\/ul>\n<\/div>\n<p><a name=\"10\"><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><br>&nbsp;<br><strong><strong>The 10 essential steps for successfully starting a project<\/strong><\/strong><\/h2>\n\n\n\n<p><\/p>\n\n\n\n<p>Every early stage, from goal setting to team composition, from planning to communication, plays a key role in ensuring that the project runs smoothly, in a controlled and effective manner.<\/p>\n\n\n\n<p>In this section, we will walk you through the <strong>10 key steps<\/strong> every project manager should follow to <a href=\"https:\/\/twproject.com\/blog\/how-to-kick-off-a-project-successfully\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>start a project<\/strong><\/a> in a structured and <strong>results-oriented<\/strong> fashion.<\/p>\n\n\n\n<p><a name=\"goal\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>1. Clear goal setting<\/strong><\/strong><\/h3>\n\n\n\n<p>The first question we must ask is: <strong>what do we want to achieve<\/strong>? Goals are the power behind every effort. Vague goals could be the first obstacle on the road to success.<\/p>\n\n\n\n<p>An effective goal must be <a href=\"https:\/\/twproject.com\/blog\/smart-goals-to-plan-a-project\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>S.M.A.R.T.<\/strong><\/a>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Specific<\/strong>: What exactly do we want to achieve?<\/li>\n\n\n\n<li><strong>Measurable<\/strong>: How do we measure success?<\/li>\n\n\n\n<li><strong>Achievable<\/strong>: Do we have the resources to achieve this?<\/li>\n\n\n\n<li><strong>Relevant<\/strong>: Is it consistent with our company strategy?<\/li>\n\n\n\n<li><strong>Time-bound<\/strong>: Within what time frame?<\/li>\n<\/ul>\n\n\n\n<p>Only in this way will it be possible to <strong>complete the project<\/strong> according to expectations..<\/p>\n\n\n\n<p><a name=\"stakeholder\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>2. Identifying stakeholders<\/strong><\/strong><\/h3>\n\n\n\n<p>It is critical to know <strong>who is involved<\/strong> in every project: clients, customers, end users, sponsors, and teams.<\/p>\n\n\n\n<p>Stakeholders must be given a voice from the very beginning to understand their needs, expectations, and potential concerns. Their influence can be decisive in <strong>project management<\/strong>, especially regarding decision-making.<\/p>\n\n\n\n<p><a name=\"team\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>3. Team composition and responsibilities<\/strong><\/strong><\/h3>\n\n\n\n<p>Another key step is selecting the <strong>members of the project team<\/strong>. Each individual must have clearly defined roles and responsibilities. This improves efficiency and reduces the risk of overlap or operational gaps.<\/p>\n\n\n\n<p>Creating an organizational chart to provide a clear overview of the entire work group is also worthwhile.<\/p>\n\n\n\n<p>The project manager plays a central role here: they must coordinate their team, motivate them, <strong>monitor progress<\/strong>, and ease internal communication.<\/p>\n\n\n\n<p>No project can be successful without a well-built team. Selecting the right <strong>project team members<\/strong> means choosing competent, motivated people who complement each other. Yet it&#8217;s not enough to choose people: you must define roles and responsibilities accurately.<\/p>\n\n\n\n<p>Each team member must be informed about:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Their operational role<\/li>\n\n\n\n<li>Delivery schedules<\/li>\n\n\n\n<li>Project expectations<\/li>\n\n\n\n<li>Communication procedures<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>A seasoned project manager promotes collaboration, <strong>monitors progress<\/strong>, and prevents internal conflicts, ensuring the team operates smoothly.<\/p>\n\n\n\n<p><a name=\"planning\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>4. Initial planning<\/strong><\/strong><\/h3>\n\n\n\n<p>The <strong>planning phase<\/strong> is one of the most delicate moments in <strong>project management<\/strong>. Budget estimates are made in this phase, schedules are established, key milestones are defined, and potential risks are anticipated. This is not just a theoretical exercise: robust planning allows you to address critical issues proactively.<\/p>\n\n\n\n<p>Each task included in the plan must be associated with resources, timelines, and responsibilities.<\/p>\n\n\n\n<p>Good planning includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/twproject.com\/blog\/manage-projects-wbs\/\" target=\"_blank\" rel=\"noreferrer noopener\">Work breakdown structure<\/a><\/li>\n\n\n\n<li>Schedule estimate (<a href=\"https:\/\/twproject.com\/blog\/gantt-for-a-project-productive-advantage-or-disadvantage\/\" target=\"_blank\" rel=\"noreferrer noopener\">Gantt<\/a> or <a href=\"https:\/\/twproject.com\/blog\/project-roadmap-important\/\" target=\"_blank\" rel=\"noreferrer noopener\">roadmap<\/a>)<\/li>\n\n\n\n<li><a href=\"https:\/\/twproject.com\/blog\/project-budget-7-main-tips-prepare\/\" target=\"_blank\" rel=\"noreferrer noopener\">Budget<\/a> setting<\/li>\n\n\n\n<li><a href=\"https:\/\/twproject.com\/blog\/resource-allocation\/\" target=\"_blank\" rel=\"noreferrer noopener\">Resource allocation<\/a><\/li>\n\n\n\n<li>Constraints identification<\/li>\n<\/ul>\n\n\n\n<p><strong>Strategically planning a project<\/strong> can make the difference between success and failure.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"840\" height=\"325\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/05\/Gantt_twproject-840x325.jpg\" alt=\"gantt chart\" class=\"wp-image-26586\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/05\/Gantt_twproject-840x325.jpg 840w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/05\/Gantt_twproject-400x155.jpg 400w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/05\/Gantt_twproject-1536x595.jpg 1536w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/05\/Gantt_twproject-705x273.jpg 705w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/05\/Gantt_twproject.jpg 1833w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/figure>\n\n\n\n<p><a name=\"scope\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>5. Scope definition<\/strong><\/strong><\/h3>\n\n\n\n<p>One of the most common mistakes in <strong>project management<\/strong> is starting without a clear definition of the scope. Frequently, there is a bias toward &#8220;doing everything,&#8221; but every project has its own specific limitations regarding objectives and resources. An ambiguous definition could lead to confusion, delays, and unexpected budget spikes.<\/p>\n\n\n\n<p>Therefore, the <strong>planning phase<\/strong> must include a clear <strong>definition of the project<\/strong>&#8216;s scope, stating precisely <strong>what is included<\/strong> and<strong> excluded<\/strong> from the work to be done.<\/p>\n\n\n\n<p><strong>What does the project scope include?<\/strong><strong><\/strong><\/p>\n\n\n\n<p>The <a href=\"https:\/\/twproject.com\/blog\/project-perimeter\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>project scope<\/strong><\/a> can be intended as the set of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Concrete objectives to be achieved<\/li>\n\n\n\n<li>Expected results (deliverables)<\/li>\n\n\n\n<li>Functionalities or services to be provided<\/li>\n\n\n\n<li>Technical or time constraints and limitations<\/li>\n\n\n\n<li>Efforts necessary to complete the project<\/li>\n<\/ul>\n\n\n\n<p>This definition serves to complete the project in line with expectations, without unauthorized deviations or distractions.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Risks associated with scope creep<\/strong><\/p>\n\n\n\n<p>When the scope is not clearly defined or documented, there is a risk of \u201c<strong>scope creep<\/strong>,&#8221; which is the uncontrolled increase in activities and stakeholder requests during the <strong>project lifecycle<\/strong>.<\/p>\n\n\n\n<p>Examples of scope creep:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Extra features requested \u201con the fly\u201d<\/li>\n\n\n\n<li>Unplanned activities that keep getting \u201cpiled on\u201d<\/li>\n\n\n\n<li>Changes that are not formally tracked<\/li>\n<\/ul>\n\n\n\n<p>This can pose a huge hindrance to delivering the final result on schedule and within budget.<\/p>\n\n\n\n<p><a name=\"how\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>How to define the scope effectively<\/strong><\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Involve stakeholders from the get-go<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Talk to customers, sponsors, and end users to understand their real needs.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Use requirements collection techniques<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Interviews, workshops, brainstorming sessions, surveys: every project must be based on concrete input.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Prepare your scope document<\/strong><\/li>\n<\/ul>\n\n\n\n<p>Write an official document that describes in detail:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Goals<\/li>\n\n\n\n<li>Boundaries (what is included\/excluded)<\/li>\n\n\n\n<li>Deliverables<\/li>\n\n\n\n<li>Major milestones<\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Create a WBS (Work Breakdown Structure)<\/strong>:  <a href=\"https:\/\/twproject.com\/blog\/break-project-examples-wbs\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Break down your project<\/strong><\/a> into smaller hierarchical components. This helps visualize the whole effort and makes planning easier.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"690\" height=\"430\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/04\/project-wbs.png\" alt=\"wbs twproject\" class=\"wp-image-22799\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/04\/project-wbs.png 690w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/2024\/04\/project-wbs-400x249.png 400w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Get formal approval<\/strong>: Sponsors and stakeholders must approve the scope document before launch.<\/li>\n<\/ul>\n\n\n\n<p><a name=\"twp\"><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><strong>How Twproject helps you define and control your scope<\/strong><\/strong><\/h2>\n\n\n\n<p><a href=\"https:\/\/twproject.com\/blog\/the-best-project-management-software\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Twproject is a project management software<\/strong><\/a> designed to support every project phase, including the critical task of defining and controlling its scope.<\/p>\n\n\n\n<p>Here&#8217;s how it can help you:<\/p>\n\n\n\n<p><strong>Clear communication with your team: project team members<\/strong> can clearly see what is (and is not) part of their work, reducing ambiguity and unauthorized extra activities.<\/p>\n\n\n\n<p><strong>Visual project design: <\/strong>With <strong>Twproject<\/strong>, you can <a href=\"https:\/\/twproject.com\/blog\/manage-projects-wbs\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>build your WBS<\/strong><\/a> directly on the platform, displaying each sub-activity in a clear and intuitive tree structure.<\/p>\n\n\n\n<p><strong>Deliverable and milestone definition: <\/strong>associate expected results, deadlines, and responsibilities with each task. This gives the project manager constant control over the work required to complete their project.<\/p>\n\n\n\n<p><strong>Scope change management:<\/strong> Every change to the scope must be tracked. Twproject logs changes, keeps historical versions, and notifies stakeholders of changes, reducing the risk of scope creep.<\/p>\n\n\n\n<p><strong>Link between scope, budget, and resources: <\/strong>the efforts defined in the scope are connected to costs and assigned resources. This means that every extension of the scope has a measurable impact, promoting informed decisions.<\/p>\n\n\n\n<p><a name=\"risk\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>6. Risk assessment<\/strong><\/strong><\/h3>\n\n\n\n<p>Every project could be vulnerable to risks: unexpected technical issues, delays, lack of resources, problems with suppliers. Anticipating these risks at the initial stage can be crucial in ensuring you are not caught unprepared.<\/p>\n\n\n\n<p>The risk checklist should include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Internal and external risks<\/li>\n\n\n\n<li>Likelihood of occurrence<\/li>\n\n\n\n<li>Potential impact<\/li>\n\n\n\n<li>Prevention or response strategies<\/li>\n<\/ul>\n\n\n\n<p><strong>Good risk management<\/strong> is one of the key skills of any project manager.<\/p>\n\n\n\n<p><a name=\"document\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>7. Initial document preparation<\/strong><\/strong><\/h3>\n\n\n\n<p>Documenting means clarity and traceability. Every project must be supported by a number of key documents, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/twproject.com\/blog\/write-excellent-project-charter\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Project charter<\/strong><\/a>: The official launch document<\/li>\n\n\n\n<li><strong>Business case<\/strong>: Financial feasibility analysis<\/li>\n\n\n\n<li><strong>Project plan<\/strong>: Outlines activities, timelines, resources, and budget<\/li>\n\n\n\n<li><strong>Risk register<\/strong>: Includes all potential issues mapped out.<\/li>\n\n\n\n<li><strong>Stakeholder register<\/strong>: Lists the parties involved<\/li>\n<\/ul>\n\n\n\n<p>This documentation helps keep track of decisions and project developments over time.<\/p>\n\n\n\n<p><a name=\"communication\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>8. Communication and alignment<\/strong><\/strong><\/h3>\n\n\n\n<p>One of the most overlooked yet critical elements is internal communication. Often, project problems arise not from technical errors but from a lack of team alignment.<\/p>\n\n\n\n<p>It is crucial to define:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A communication plan (who communicates what, when, and how)<\/li>\n\n\n\n<li>A reporting and update system<\/li>\n\n\n\n<li>Collaboration tools accessible to everyone<\/li>\n<\/ul>\n\n\n\n<p>An informed team can be responsive, motivated, and accountable. The kickoff meeting is the perfect moment to officially launch the project and share objectives, strategies, and tools.<\/p>\n\n\n\n<p><a name=\"tool\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>9. Working tool setup<\/strong><\/strong><\/h3>\n\n\n\n<p>To <strong>start a project<\/strong> in a structured way, it is important to have adequate digital tools. <a href=\"https:\/\/twproject.com\/blog\/the-best-project-management-software\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Project management software such as Twproject<\/strong><\/a> helps you to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Organize activities<\/li>\n\n\n\n<li>Allocate resources<\/li>\n\n\n\n<li>View the <strong>project life cycle<\/strong><\/li>\n\n\n\n<li>Monitor the <strong>final result<\/strong><\/li>\n\n\n\n<li>Keep track of <strong>progress<\/strong><\/li>\n<\/ul>\n\n\n\n<p><strong>Twproject <\/strong>offers a full-featured environment for<strong> project management, <\/strong>integrating planning, communication,<strong> <\/strong><a href=\"https:\/\/twproject.com\/blog\/timesheet-time-tracking-twproject\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>time tracking<\/strong><\/a> and document management capabilities into a single platform.<\/p>\n\n\n\n<p><a name=\"validation\"><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>10. Validation and final approval<\/strong><\/strong><\/h3>\n\n\n\n<p>The final step on this checklist is to get official approval from stakeholders. This means that the plan, budget, and resources have been validated, and the project can begin.<\/p>\n\n\n\n<p>The validation:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Certifies feasibility<\/li>\n\n\n\n<li>Confirms alignment between parties<\/li>\n\n\n\n<li>Formalizes organizational commitment<\/li>\n\n\n\n<li>Authorizes activity execution<\/li>\n<\/ul>\n\n\n\n<p>Without this step, virtually any project could be at risk of ambiguity and delays. The final green light signals that everything is ready to proceed confidently.<\/p>\n\n\n\n<p>&nbsp;<\/p>\n\n\n\n<p><strong>Every project<\/strong> starts with great ambitions, but only those that are well thought out actually achieve their <strong>final outcome<\/strong>. Following a <strong>project launch checklist<\/strong> ensures that no critical aspects are overlooked, that the team is involved, and that work is carried out in a structured and efficient manner.<\/p>\n\n\n\n<p><strong>Project management<\/strong> is not just a technical matter, but also involves methodology, communication, and strategy. A good start could be the key to <strong>completing<\/strong> even the most complex projects.<\/p>\n\n\n\n<p>Remember: a successful start must be backed up by the right tools, strong leadership, and a shared vision. That&#8217;s why equipping yourself with <strong>project management software<\/strong> <strong>such as Twproject <\/strong>can make a difference at all <strong>project<\/strong> stages.<\/p>\n\n\n\n<div id=\"blog-promo-box\">\n<div class=\"flex_column_table dark pattern-2\">\n<div class=\"flex_column text_column\">\n<div>\n<h3>Plan your projects with Twproject<\/h3>\n<div class=\"avia-button-wrap avia-button-left\"><a class=\"avia-button avia-icon_select-no avia-color-custom avia-size-xlarge\" href=\"https:\/\/demo.twproject.com\/applications\/teamwork\/welcome\/createUserEnvironment.jsp\" target=\"blank\" rel=\"noopener\"><span class=\"avia_iconbox_title\">Try it now!<br>\n<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"flex_column photo_column\" style=\"background-image: url('https:\/\/static.twproject.com\/blog\/wp-content\/uploads\/2021\/09\/blog-banner-1.jpg');\"><\/div>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done on time and within budget. In this article, you&#8217;ll find a hands-on checklist to ensure every project gets off to a good start and avoids common mistakes or oversights that &hellip; <a href=\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Checklist for starting a project&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":27854,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_body_class":"","_custom_post_class":"","footnotes":""},"categories":[58],"tags":[],"class_list":["post-27850","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Checklist for starting a project - Twproject.com<\/title>\n<meta name=\"description\" content=\"Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Checklist for starting a project - Twproject.com\" \/>\n<meta property=\"og:description\" content=\"Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done\" \/>\n<meta property=\"og:url\" content=\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Twproject.com\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-07T07:00:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T08:41:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"640\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Twproject Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Twproject Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\"},\"author\":{\"name\":\"Twproject Staff\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\"},\"headline\":\"Checklist for starting a project\",\"datePublished\":\"2025-10-07T07:00:13+00:00\",\"dateModified\":\"2025-10-07T08:41:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\"},\"wordCount\":1530,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp\",\"articleSection\":[\"Project management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\",\"url\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\",\"name\":\"Checklist for starting a project - Twproject.com\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp\",\"datePublished\":\"2025-10-07T07:00:13+00:00\",\"dateModified\":\"2025-10-07T08:41:12+00:00\",\"description\":\"Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done\",\"breadcrumb\":{\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp\",\"width\":960,\"height\":640,\"caption\":\"starting a project - project management software twproject\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/twproject.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Checklist for starting a project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/twproject.com\/blog\/#website\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"name\":\"Twproject.com\",\"description\":\"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.\",\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/twproject.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/twproject.com\/blog\/#organization\",\"name\":\"Twproject - Project Management Software\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"width\":331,\"height\":110,\"caption\":\"Twproject - Project Management Software\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\",\"name\":\"Twproject Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"caption\":\"Twproject Staff\"},\"sameAs\":[\"twadmin\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Checklist for starting a project - Twproject.com","description":"Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/","og_locale":"en_US","og_type":"article","og_title":"Checklist for starting a project - Twproject.com","og_description":"Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done","og_url":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/","og_site_name":"Twproject.com","article_published_time":"2025-10-07T07:00:13+00:00","article_modified_time":"2025-10-07T08:41:12+00:00","og_image":[{"width":960,"height":640,"url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp","type":"image\/webp"}],"author":"Twproject Staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Twproject Staff","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#article","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/"},"author":{"name":"Twproject Staff","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608"},"headline":"Checklist for starting a project","datePublished":"2025-10-07T07:00:13+00:00","dateModified":"2025-10-07T08:41:12+00:00","mainEntityOfPage":{"@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/"},"wordCount":1530,"commentCount":0,"publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"image":{"@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp","articleSection":["Project management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/","url":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/","name":"Checklist for starting a project - Twproject.com","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage"},"image":{"@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp","datePublished":"2025-10-07T07:00:13+00:00","dateModified":"2025-10-07T08:41:12+00:00","description":"Starting a project correctly is the first step to ensuring its success. We often underestimate how important the early stages are for getting things done","breadcrumb":{"@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#primaryimage","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/2025\/10\/Checklist-for-starting-a-project.webp","width":960,"height":640,"caption":"starting a project - project management software twproject"},{"@type":"BreadcrumbList","@id":"https:\/\/twproject.com\/blog\/checklist-for-starting-a-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/twproject.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Checklist for starting a project"}]},{"@type":"WebSite","@id":"https:\/\/twproject.com\/blog\/#website","url":"https:\/\/twproject.com\/blog\/","name":"Twproject.com","description":"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.","publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/twproject.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/twproject.com\/blog\/#organization","name":"Twproject - Project Management Software","url":"https:\/\/twproject.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","width":331,"height":110,"caption":"Twproject - Project Management Software"},"image":{"@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608","name":"Twproject Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","caption":"Twproject Staff"},"sameAs":["twadmin"]}]}},"_links":{"self":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/27850","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/comments?post=27850"}],"version-history":[{"count":9,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/27850\/revisions"}],"predecessor-version":[{"id":27870,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/27850\/revisions\/27870"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media\/27854"}],"wp:attachment":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media?parent=27850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/categories?post=27850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/tags?post=27850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}