{"id":14340,"date":"2021-01-20T07:00:54","date_gmt":"2021-01-20T07:00:54","guid":{"rendered":"https:\/\/twproject.com\/?p=14340"},"modified":"2021-01-15T15:22:47","modified_gmt":"2021-01-15T15:22:47","slug":"project-activities-role-characteristics","status":"publish","type":"post","link":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/","title":{"rendered":"Project activities: role and characteristics"},"content":{"rendered":"<p>In this article we will <strong>examine the project activities<\/strong>, their role and characteristics.<\/p>\n<div class=\"table-of-content\">\n<h5>CONTENT<\/h5>\n<ul>\n<li><a href=\"#what\">What defines a project?<\/a><\/li>\n<li><a href=\"#goals\">1. Clarify project goals and scope<\/a><\/li>\n<li><a href=\"#breakdown\">2. Develop a work breakdown structure<\/a><\/li>\n<li><a href=\"#schedule\">3. Deliver a realistic schedule<\/a><\/li>\n<li><a href=\"#risk\">4. Create a project risk plan<\/a><\/li>\n<li><a href=\"#change\">5. Manage change requests<\/a><\/li>\n<li><a href=\"#planning\">Project activities: planning and development<\/a><\/li>\n<li><a href=\"#activities\">1. Setting up project activities<\/a><\/li>\n<li><a href=\"#relations\">2. Defining relations between activities<\/a><\/li>\n<li><a href=\"#resources\">3. Estimating resources needed to perform activities<\/a><\/li>\n<li><a href=\"#duration\">4. Estimating activity duration<\/a><\/li>\n<\/ul>\n<\/div>\n<p>To do this, we would like to start from the basics, i.e. the definition of a project and then fully understand the activities necessary for its development.<\/p>\n<p>What we want to do is create a mind map in which the<strong> individual project activities<\/strong> are not confused and random, but find a meaningful and temporal setting in your mind.<br \/>\n<a name=\"what\"><\/a><\/p>\n<h2>What defines a project?<\/h2>\n<p><a href=\"https:\/\/twproject.com\/blog\/the-sixth-edition-of-the-pmbok\/\" target=\"_blank\" rel=\"noopener\">PMbok definition<\/a> of a project is &#8220;a temporary effort undertaken to create a unique product or service.&#8221;<\/p>\n<p>In other words, it is <strong>any endeavor<\/strong>, done individually or collaboratively, <strong>designed to achieve a particular goal<\/strong>.<\/p>\n<p>Thus, projects are a temporary effort that is carefully planned, researched, executed, monitored, and delivered within a specified period and within a given cost.<\/p>\n<p>Projects can range from simple to complex and can be managed by an individual or an <a href=\"https:\/\/twproject.com\/blog\/create-project-team-7-tips-identifying-approving-supplying-best\/\" target=\"_blank\" rel=\"noopener\">entire project team<\/a>.<\/p>\n<p>A project must follow<strong> 5 basic principles<\/strong>:<br \/>\n<a name=\"goals\"><\/a><\/p>\n<h3>1. Clarify project goals and scope<\/h3>\n<p>Before a project begins, the<strong> overall goal, scope and scale of the project<\/strong> must be clearly set out and agreed upon. You can read this <a href=\"https:\/\/twproject.com\/blog\/scope-management-managing-project-scope\/\" target=\"_blank\" rel=\"noopener\">article about project scope<\/a>.<br \/>\n<a name=\"breakdown\"><\/a><\/p>\n<h3>2. Develop a work breakdown structure<\/h3>\n<p>Creating a Work Breakdown Structure (<a href=\"https:\/\/twproject.com\/blog\/work-breakdown-structure-suggestions-using-best\/\" target=\"_blank\" rel=\"noopener\">Work Breakdown Structure &#8211; WBS<\/a>) is an important part of the project management process, where deliverables are broken down into assignments and activities required to achieve them.<br \/>\n<a name=\"schedule\"><\/a><\/p>\n<h3>3. Deliver a realistic schedule<\/h3>\n<p>This is arguably one of the most common mistakes that project managers and teams make during <a href=\"https:\/\/twproject.com\/blog\/project-management-framework\/\" target=\"_blank\" rel=\"noopener\">project management<\/a>. People often get overly optimistic and ambitious about when a project can be delivered, resulting in getting themselves and the project results in trouble.<\/p>\n<p>The best way in this case is to visualize all aspects and needs of the project in one place, visualize the time sequence of the project, estimate how long each task would take and create a realistic schedule accordingly. This can be done by <a href=\"https:\/\/twproject.com\/blog\/gantt-for-a-project-productive-advantage-or-disadvantage\/\" target=\"_blank\" rel=\"noopener\">using the gantt<\/a> of a <a href=\"https:\/\/twproject.com\/blog\/project-management-tool-10-key-aspects-make-right-choice\/\" target=\"_blank\" rel=\"noopener\">project management software<\/a>.<br \/>\n<a name=\"risk\"><\/a><\/p>\n<h3>4. Create a project risk plan<\/h3>\n<p>After you have created a thorough list of activities, sub-activities, and <a href=\"https:\/\/twproject.com\/blog\/project-milestones\/\" target=\"_blank\" rel=\"noopener\">milestones<\/a> for the project, it&#8217;s time to ascertain all possible and potential risks involved. At this stage, you need to think about any risks that could impact the project by doing a <a href=\"https:\/\/twproject.com\/blog\/project-risk-analysis\/\" target=\"_blank\" rel=\"noopener\">proper project risk analysis<\/a> while also estimating the severity of the impact. Once finished, you need to create a <a href=\"https:\/\/twproject.com\/blog\/escalation-procedures-risk-gets-big\/\" target=\"_blank\" rel=\"noopener\">project risk response plan<\/a> explaining the risk management.<br \/>\n<a name=\"change\"><\/a><\/p>\n<h3>5. Manage change requests<\/h3>\n<p>A project, by its definition, is something that does not remain static over time and is subject to some degree of change that may relate to workflow or workforce for example. No matter what change, or <a href=\"https:\/\/twproject.com\/it\/blog\/gestione-delle-richieste-di-modifica\/\" target=\"_blank\" rel=\"noopener\">project change requests<\/a> are received, a project manager must have a clear grasp of what the impact of this change will be and how to ensure it is handled smoothly and quickly.<br \/>\n<a name=\"planning\"><\/a><\/p>\n<h2>Project activities: planning and development<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-14349\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/planning-project-activities.png\" alt=\"planning project activities\" width=\"1280\" height=\"853\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/planning-project-activities.png 1280w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/planning-project-activities-630x420.png 630w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/planning-project-activities-1130x753.png 1130w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/planning-project-activities-705x470.png 705w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/planning-project-activities-450x300.png 450w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px\" \/><\/p>\n<p>As you can see, a project is therefore <strong>made up of activities<\/strong>, and it is through these activities &#8211; <strong>arranged in a relevant way<\/strong> &#8211; that a project can achieve its intended outcome and be completed successfully.<\/p>\n<p>So let&#8217;s look more specifically at the <strong>role and characteristics of project activities<\/strong>.<\/p>\n<p><a href=\"https:\/\/twproject.com\/blog\/work-time-management-project-priority\/\" target=\"_blank\" rel=\"noopener\">Project time management<\/a> comprises two sets of processes for planning and scheduling project activities necessary for timely project completion.<\/p>\n<ol>\n<li><strong>Project activity planning and scheduling.<\/strong><\/li>\n<li><strong>Project implementation program development.<\/strong><\/li>\n<\/ol>\n<p>When planning and scheduling project tasks and activities, the project manager must perform the following four steps:<\/p>\n<ul>\n<li>Setting up activities.<\/li>\n<li>Defining relations between activities.<\/li>\n<li>Estimating resources needed to perform activities.<\/li>\n<li>Estimating activity duration.<\/li>\n<\/ul>\n<p>Let&#8217;s examine each step in more detail:<br \/>\n<a name=\"activities\"><\/a><\/p>\n<h3>1. Setting up project activities<\/h3>\n<p>The first phase of planning and scheduling project activities require the project manager to establish the amount of actions and activities needed to produce project deliverables in a timely manner.<\/p>\n<p>The input to this process will be the definition of the <a href=\"https:\/\/twproject.com\/blog\/identify-project-deliverables\/\" target=\"_blank\" rel=\"noopener\">project deliverables<\/a>.<\/p>\n<p>The project manager should also work on developing project activity templates to help streamline the project planning process.<\/p>\n<p>Specific steps &#8211; or <a href=\"https:\/\/twproject.com\/blog\/project-milestones\/\" target=\"_blank\" rel=\"noopener\">milestones<\/a> &#8211; should be identified and approved for each of the listed activities.<br \/>\n<a name=\"relations\"><\/a><\/p>\n<h3>2. Defining relations between activities<\/h3>\n<p>The next step in project activity planning involves the project manager sequencing all of the activities determined in the previous step.<\/p>\n<p>The manager will use the project task lists, milestone list, and <a href=\"https:\/\/twproject.com\/it\/blog\/scope-management-gestire-lambito-di-progetto\/\" target=\"_blank\" rel=\"noopener\">project scope statement<\/a> per to define the relationships between the tasks.<\/p>\n<p>With the help of <a href=\"https:\/\/twproject.com\/it\/\">project management software<\/a> ou can set priorities for each of the project activities and make the sequences of activities organized and sorted by importance and urgency.<\/p>\n<p>You also need to define dependencies between activities, which can be either internal or external.<\/p>\n<p>Activities with internal dependencies are related to any actions the project team will take to produce deliverables within the existing work environment, while activities with external dependencies are related to non-project factors that define the success of project-related activities.<\/p>\n<p>Both types of activity dependencies should be addressed and added to sequenced and prioritized task lists.<\/p>\n<p>Once the relationships are defined, the project manager should update the project activity templates, outline dependencies, and link them to the product scope statement.<br \/>\n<a name=\"resources\"><\/a><\/p>\n<h3>3. Estimating resources needed to perform activities<\/h3>\n<p>At this stage, the project manager should review the <a href=\"https:\/\/twproject.com\/blog\/project-stakeholders\/\" target=\"_blank\" rel=\"noopener\">stakeholder<\/a> requirements and scope statement to assess the amount of resources needed to carry out project activities.<\/p>\n<p>Expert opinion and alternatives analysis should also be used in some cases for this purpose.<\/p>\n<p>The project manager should then also develop resource calendars and define the types of resources required.<\/p>\n<p>Once all of this information has been gathered and analyzed, it should be used to make a resource breakdown of activities sorted by type, priority, and time.<\/p>\n<p>This breakdown is crucial to creating the project implementation schedule.<br \/>\n<a name=\"duration\"><\/a><\/p>\n<h3>4. Estimating activity duration<\/h3>\n<p>The final stage of project activity planning and scheduling involves the project manager defining and estimating an amount of work time required to complete each identified activity.<\/p>\n<p>The amount of time will depend on the amount of work effort and resources available for the activity.<\/p>\n<p>The project manager should review the resource breakdown and project activity models to estimate the number of work periods required to complete the identified activities and thereby produce the desired results.<\/p>\n<p>The output of this process is the activity estimates linked to the resource schedules.<\/p>\n<p>&nbsp;<\/p>\n<p>The four stages of <strong>project activity planning and scheduling<\/strong> lay the foundation for creating a <a href=\"https:\/\/twproject.com\/blog\/schedule-importance-project-manager\/\" target=\"_blank\" rel=\"noopener\">detailed timeline of project implementation<\/a>.<\/p>\n<p>In a nutshell, a successful project is therefore based on the effectiveness of the individual project activities that are part of the project.<\/p>\n<div class=\"tw_promobox box_type3 sBlue sImage\" style=\"background-image: url('https:\/\/static.twproject.com\/blog\/wp-content\/uploads\/get-it-now-r.jpg'); background-size: 140%; background-position: -90px -210px;\">\n<div class=\"av_promobox avia-button-yes avia-builder-el-1 el_after_av_promobox avia-builder-el-last\">\n<div class=\"avia-promocontent\">\n<h2>Plan your work and your project deadlines.<\/h2>\n<\/div>\n<div class=\"avia-button-wrap avia-button-right \"><a class=\"avia-button avia-icon_select-no avia-color-custom avia-size-xlarge\" href=\"https:\/\/demo.twproject.com\/applications\/teamwork\/welcome\/createUserEnvironment.jsp\" target=\"blank\"><span class=\"avia_iconbox_title\">Try Twproject!<\/span><\/a><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In this article we will examine the project activities, their role and characteristics. CONTENT What defines a project? 1. Clarify project goals and scope 2. Develop a work breakdown structure 3. Deliver a realistic schedule 4. Create a project risk plan 5. Manage change requests Project activities: planning and development 1. Setting up project activities &hellip; <a href=\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Project activities: role and characteristics&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":14348,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_body_class":"","_custom_post_class":"","footnotes":""},"categories":[58],"tags":[],"class_list":["post-14340","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project activities: role and characteristics - Twproject.com<\/title>\n<meta name=\"description\" content=\"In this article we will examine the project activities, their role and characteristics.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project activities: role and characteristics - Twproject.com\" \/>\n<meta property=\"og:description\" content=\"In this article we will examine the project activities, their role and characteristics.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\" \/>\n<meta property=\"og:site_name\" content=\"Twproject.com\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-20T07:00:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Twproject Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Twproject Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\"},\"author\":{\"name\":\"Twproject Staff\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\"},\"headline\":\"Project activities: role and characteristics\",\"datePublished\":\"2021-01-20T07:00:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\"},\"wordCount\":1153,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png\",\"articleSection\":[\"Project management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\",\"url\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\",\"name\":\"Project activities: role and characteristics - Twproject.com\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png\",\"datePublished\":\"2021-01-20T07:00:54+00:00\",\"description\":\"In this article we will examine the project activities, their role and characteristics.\",\"breadcrumb\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png\",\"width\":1280,\"height\":853,\"caption\":\"project activities\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/twproject.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project activities: role and characteristics\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/twproject.com\/blog\/#website\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"name\":\"Twproject.com\",\"description\":\"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.\",\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/twproject.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/twproject.com\/blog\/#organization\",\"name\":\"Twproject - Project Management Software\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"width\":331,\"height\":110,\"caption\":\"Twproject - Project Management Software\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\",\"name\":\"Twproject Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"caption\":\"Twproject Staff\"},\"sameAs\":[\"twadmin\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project activities: role and characteristics - Twproject.com","description":"In this article we will examine the project activities, their role and characteristics.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/","og_locale":"en_US","og_type":"article","og_title":"Project activities: role and characteristics - Twproject.com","og_description":"In this article we will examine the project activities, their role and characteristics.","og_url":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/","og_site_name":"Twproject.com","article_published_time":"2021-01-20T07:00:54+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png","type":"image\/png"}],"author":"Twproject Staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Twproject Staff","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#article","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/"},"author":{"name":"Twproject Staff","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608"},"headline":"Project activities: role and characteristics","datePublished":"2021-01-20T07:00:54+00:00","mainEntityOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/"},"wordCount":1153,"commentCount":0,"publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png","articleSection":["Project management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/","url":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/","name":"Project activities: role and characteristics - Twproject.com","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png","datePublished":"2021-01-20T07:00:54+00:00","description":"In this article we will examine the project activities, their role and characteristics.","breadcrumb":{"@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#primaryimage","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-activities.png","width":1280,"height":853,"caption":"project activities"},{"@type":"BreadcrumbList","@id":"https:\/\/twproject.com\/blog\/project-activities-role-characteristics\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/twproject.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project activities: role and characteristics"}]},{"@type":"WebSite","@id":"https:\/\/twproject.com\/blog\/#website","url":"https:\/\/twproject.com\/blog\/","name":"Twproject.com","description":"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.","publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/twproject.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/twproject.com\/blog\/#organization","name":"Twproject - Project Management Software","url":"https:\/\/twproject.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","width":331,"height":110,"caption":"Twproject - Project Management Software"},"image":{"@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608","name":"Twproject Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","caption":"Twproject Staff"},"sameAs":["twadmin"]}]}},"_links":{"self":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/14340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/comments?post=14340"}],"version-history":[{"count":1,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/14340\/revisions"}],"predecessor-version":[{"id":14350,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/14340\/revisions\/14350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media\/14348"}],"wp:attachment":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media?parent=14340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/categories?post=14340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/tags?post=14340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}