{"id":10081,"date":"2018-08-31T08:00:06","date_gmt":"2018-08-31T08:00:06","guid":{"rendered":"https:\/\/twproject.com\/?p=10081"},"modified":"2024-08-01T08:52:56","modified_gmt":"2024-08-01T08:52:56","slug":"project-workload-how-to-plan-it-to-the-best","status":"publish","type":"post","link":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/","title":{"rendered":"Project workload: how to plan it to the best"},"content":{"rendered":"<p>A project manager has to deal with <strong>customer expectations<\/strong>, <strong>project deadlines<\/strong> and <strong>evolving priorities,<\/strong> all of this while trying to <strong>coordinate and manage the team <\/strong>and<strong> respond to stakeholder demands<\/strong>.<\/p>\n<p>Let&#8217;s face it, it is a demanding job that takes time and effort to manage all the parts and sometimes hours are never enough!<\/p>\n<p>Project managers are involved both in <strong>managing the workload<\/strong> of their team as well as <strong>managing their workload<\/strong>.<\/p>\n<p><strong>The organization and time management skills<\/strong> are therefore essential to ensure that the work is done as efficiently as possible.<\/p>\n<div class=\"table-of-content\">\n<h5>CONTENT INDEX<\/h5>\n<ul>\n<li><a href=\"#set\">Set clear expectations<\/a><\/li>\n<li><a href=\"#communicate\">Communicate consistently<\/a><\/li>\n<li><a href=\"#distribute\">Distribute the workload<\/a><\/li>\n<li><a href=\"#analyze\">Always analyze<\/a><\/li>\n<\/ul>\n<\/div>\n<p>This is why it is so important to think about how to prioritize and <strong>organize the workload<\/strong>.<\/p>\n<p><strong>Keeping the workload under control<\/strong> saves time, simplifies processes, reduces costs and improves productivity.<\/p>\n<p>Here are four suggestions for <strong>effective workload management<\/strong>.<br \/>\n<a name=\"set\"><\/a><\/p>\n<h2><strong>1) Set clear expectations<\/strong><\/h2>\n<p>We spend most of our working life managing the <strong>expectations and priorities of other people<\/strong>.<\/p>\n<p>And when those expectations are not clearly communicated, the<strong> project team<\/strong> does not know the limits and rules in which it should operate.<\/p>\n<p>Clearly establish goals from the beginning and organize regular <strong>meetings for each new project<\/strong> and during the lifetime of a project, clarify the situation with the entire team.<\/p>\n<p>All those involved in the project should know the <strong>general vision<\/strong>, the role they play and how they should behave.<\/p>\n<p>These meetings serve to<strong> set the basic rules<\/strong>, answer questions and doubts and make sure everyone is moving in the same direction.<\/p>\n<p><strong>Internal planning documents<\/strong> are valuable for these initial conversations.<\/p>\n<p>These documents serve as a framework for<strong> project expectations<\/strong> and typically include:<\/p>\n<ul>\n<li>Context on the problem that the project should solve and the motivations;<\/li>\n<li><strong>Goals and requirements of the project<\/strong>;<\/li>\n<li>Summary of the solution;<\/li>\n<li><strong>FAQ<\/strong>, frequently asked questions about the project.<\/li>\n<\/ul>\n<p>The planning documents also serve as official documents to consult during the entire duration of the project.<\/p>\n<p>The <strong>project document<\/strong> can also be reviewed during meetings with customers and other stakeholders to remind them of the goals and direction of the project.<\/p>\n<p><strong>Establishing clear and realistic expectations<\/strong> at the beginning of a project and ensuring that these are accepted and respected by all stakeholders is the key to avoid potential disappointments and mistrust.<br \/>\n<a name=\"communicate\"><\/a><\/p>\n<h2><strong>2) Communicate consistently<\/strong><\/h2>\n<p>Even the smallest misunderstandings can cause <strong>stress, frustratio<\/strong>n and resentment among the employees.<\/p>\n<p>A clear and coherent communication from the beginning can help to avoid these negative emotions and feelings.<\/p>\n<p>A <strong>structured communication process<\/strong> is essential, especially when activities become more complex.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-10112 aligncenter\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload-630x420.jpg\" alt=\"project workload\" width=\"630\" height=\"420\" srcset=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload-630x420.jpg 630w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload-1130x753.jpg 1130w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload-1500x1000.jpg 1500w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload-705x470.jpg 705w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload-450x300.jpg 450w, https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.jpg 1920w\" sizes=\"auto, (max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 984px) 61vw, (max-width: 1362px) 45vw, 600px\" \/><\/p>\n<p>Not only it is necessary to make regular meetings with the team in order to remember the <strong>goals of the project<\/strong> and to align on the activities, but also to share the feelings the various members and if they have particular worries.<\/p>\n<p>This dialogue also helps to understand how and when it is necessary to mak<strong>e transfers of resources<\/strong> to provide better support to the team and make it work better.<\/p>\n<p>Even if everything is done for the best, deadlines and costs <strong>are in line<\/strong>, and the team is doing a good job, it is right to inform employees that their work is appreciated.<\/p>\n<p>The key is to help them understand and stay focused on the big picture and goals, support them and continuously recognize how their contributions are driving the project.<br \/>\n<a name=\"distribute\"><\/a><\/p>\n<h2><strong>3) Distribute the workload<\/strong><\/h2>\n<p>What are the <strong>skills of the project team<\/strong>?<\/p>\n<p>Who is actually available during the entire duration of the project?<\/p>\n<p>What are the<strong> strengths and weaknesses<\/strong> of each collaborator?<\/p>\n<p>Often there is the temptation to <strong>overload the best employees<\/strong> at the expense of others.<\/p>\n<p>However, this behavior will not only lead the <strong>top performers<\/strong> to a possible crisis, but also the other collaborators to get bored and <strong>lose interest in the project<\/strong> in general.<\/p>\n<p>A solution could be, for example, to leave to the more performing team members the <strong>most complex tasks<\/strong> and everything else is distributed evenly in the team.<\/p>\n<p>Clearly, <strong>staffing needs<\/strong> will change during project execution.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-14468\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/assignment.gif\" alt=\"\" width=\"1130\" height=\"422\"><\/p>\n<p>For this reason, you need to be aware of how each member of the team spends their time, so that there is space for flexibility to adjust the course when necessary.<\/p>\n<p>The <strong>resource program<\/strong>, like any project activity, must also be strategically planned.<\/p>\n<p>Moreover, it is also necessary for everyone to understand expectations and how everyone is contributing to <strong>superior goals<\/strong>.<\/p>\n<p>In case of doubts or problems, the team should not be afraid to communicate or and should not find<strong> blocks to communication<\/strong> in the work environment.<\/p>\n<p>It is the responsibility of the project manager to ensure a <strong>fair amount of work<\/strong> for all team members, based on their individual knowledge, skills and experience.<br \/>\n<a name=\"analyze\"><\/a><\/p>\n<h2><strong>4) Always analyze<\/strong><\/h2>\n<p>You can not manage what is not measured.<\/p>\n<p>Therefore, it is essential to have <strong>workload management software<\/strong> available to keep track of <strong>project successes and challenges<\/strong>.<\/p>\n<p>However, in particular situations, such as meetings, it is possible to use also other <strong>effective tools for managing workload<\/strong> &#8230; such as a notebook and a pen.<\/p>\n<p>Every day, when analyzing the situation of the project, it is possible to take note of any <strong>opportunities or possible risks<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-14466\" src=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/operator-load.gif\" alt=\"\" width=\"1130\" height=\"647\"><\/p>\n<p>During <strong>meetings with employees and stakeholders<\/strong>, you can take note of doubts, questions, feedback, impressions that are exposed.<\/p>\n<p>Over time, by reviewing the notes, you will be able to keep <strong>track of project results<\/strong> and resource trends.<\/p>\n<p>Perhaps a customer&#8217;s projects exceed the budget everytime?<\/p>\n<p>One of the team members is constantly overloaded with work while another continues to ask for more responsibilities?<\/p>\n<p>If you create a constant habit of taking notes and examining them every week or month, you can identify what works and what does not and start <strong>solving the recurring problems<\/strong>, so that they do not persist.<\/p>\n<p>Some useful questions to ask are:<\/p>\n<ul>\n<li>What worked well in this project?<\/li>\n<li>Why did this project exceed the budget?<\/li>\n<li>Has this project been profitable?<\/li>\n<li>Who is overburdened with work?<\/li>\n<\/ul>\n<p>Understanding and recording these data helps identify which <strong>process changes <\/strong>are needed, so you can iteratively improve your priority and <strong>organize the workload<\/strong>.<\/p>\n<p>It is clear that the use of a special software is essential to simplify and optimize the outputs of this analysis.<\/p>\n<p>In fact, the classification of data allows an analysis of them, as well as the strategic use with a view to improving the company.<\/p>\n<p>Proactively making <strong>intelligent decisions about the flow and workload of the team<\/strong> becomes functional thanks to the use of integrated project software.<\/p>\n<p>Do you have any suggestions on <strong>how to manage the workload to the fullest? <\/strong><\/p>\n<p>What were your biggest difficulties?<\/p>\n<p>Leave us your comment.<\/p>\n<div class=\"tw_promobox box_type2 sBlue sFilter sImage\" style=\"background-image: url('https:\/\/static.twproject.com\/blog\/wp-content\/uploads\/get-it-now-r.jpg'); background-size: 140%; background-position: -90px -290px;\">\n<div class=\"av_promobox avia-button-yes avia-builder-el-1 el_after_av_promobox avia-builder-el-last\">\n<div class=\"avia-promocontent\">\n<h2>Start planning the workload of your project.<\/h2>\n<\/div>\n<div class=\"avia-button-wrap avia-button-right \"><a class=\"avia-button avia-icon_select-no avia-color-custom avia-size-xlarge\" href=\"https:\/\/twproject.com\/on-your-server\/\"><span class=\"avia_iconbox_title\">Try Twproject!<\/span><\/a><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A project manager has to deal with customer expectations, project deadlines and evolving priorities, all of this while trying to coordinate and manage the team and respond to stakeholder demands. Let&#8217;s face it, it is a demanding job that takes time and effort to manage all the parts and sometimes hours are never enough! Project &hellip; <a href=\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Project workload: how to plan it to the best&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":10093,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_body_class":"","_custom_post_class":"","footnotes":""},"categories":[58,88,344],"tags":[],"class_list":["post-10081","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-resource-management","category-time-management-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project workload: how to plan it to the best<\/title>\n<meta name=\"description\" content=\"Organizing the project workload is essential for the success of the project itself. Here are some tips to plan it to the fullest.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project workload: how to plan it to the best\" \/>\n<meta property=\"og:description\" content=\"Organizing the project workload is essential for the success of the project itself. Here are some tips to plan it to the fullest.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\" \/>\n<meta property=\"og:site_name\" content=\"Twproject.com\" \/>\n<meta property=\"article:published_time\" content=\"2018-08-31T08:00:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-01T08:52:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Twproject Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Twproject Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\"},\"author\":{\"name\":\"Twproject Staff\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\"},\"headline\":\"Project workload: how to plan it to the best\",\"datePublished\":\"2018-08-31T08:00:06+00:00\",\"dateModified\":\"2024-08-01T08:52:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\"},\"wordCount\":1115,\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png\",\"articleSection\":[\"Project management\",\"Resource management\",\"Time management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\",\"url\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\",\"name\":\"Project workload: how to plan it to the best\",\"isPartOf\":{\"@id\":\"https:\/\/twproject.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png\",\"datePublished\":\"2018-08-31T08:00:06+00:00\",\"dateModified\":\"2024-08-01T08:52:56+00:00\",\"description\":\"Organizing the project workload is essential for the success of the project itself. Here are some tips to plan it to the fullest.\",\"breadcrumb\":{\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png\",\"width\":1920,\"height\":1080,\"caption\":\"project workload\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/twproject.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project workload: how to plan it to the best\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/twproject.com\/blog\/#website\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"name\":\"Twproject.com\",\"description\":\"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.\",\"publisher\":{\"@id\":\"https:\/\/twproject.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/twproject.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/twproject.com\/blog\/#organization\",\"name\":\"Twproject - Project Management Software\",\"url\":\"https:\/\/twproject.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"contentUrl\":\"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png\",\"width\":331,\"height\":110,\"caption\":\"Twproject - Project Management Software\"},\"image\":{\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608\",\"name\":\"Twproject Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g\",\"caption\":\"Twproject Staff\"},\"sameAs\":[\"twadmin\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project workload: how to plan it to the best","description":"Organizing the project workload is essential for the success of the project itself. Here are some tips to plan it to the fullest.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/","og_locale":"en_US","og_type":"article","og_title":"Project workload: how to plan it to the best","og_description":"Organizing the project workload is essential for the success of the project itself. Here are some tips to plan it to the fullest.","og_url":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/","og_site_name":"Twproject.com","article_published_time":"2018-08-31T08:00:06+00:00","article_modified_time":"2024-08-01T08:52:56+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png","type":"image\/png"}],"author":"Twproject Staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Twproject Staff","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#article","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/"},"author":{"name":"Twproject Staff","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608"},"headline":"Project workload: how to plan it to the best","datePublished":"2018-08-31T08:00:06+00:00","dateModified":"2024-08-01T08:52:56+00:00","mainEntityOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/"},"wordCount":1115,"publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png","articleSection":["Project management","Resource management","Time management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/","url":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/","name":"Project workload: how to plan it to the best","isPartOf":{"@id":"https:\/\/twproject.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage"},"image":{"@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage"},"thumbnailUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png","datePublished":"2018-08-31T08:00:06+00:00","dateModified":"2024-08-01T08:52:56+00:00","description":"Organizing the project workload is essential for the success of the project itself. Here are some tips to plan it to the fullest.","breadcrumb":{"@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#primaryimage","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/project-workload.png","width":1920,"height":1080,"caption":"project workload"},{"@type":"BreadcrumbList","@id":"https:\/\/twproject.com\/blog\/project-workload-how-to-plan-it-to-the-best\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/twproject.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project workload: how to plan it to the best"}]},{"@type":"WebSite","@id":"https:\/\/twproject.com\/blog\/#website","url":"https:\/\/twproject.com\/blog\/","name":"Twproject.com","description":"Twproject is a full featured web based project management software that gives you full visibility and control over your projects.Twproject is also a time tracking software, a bug tracking software, a project planning software.","publisher":{"@id":"https:\/\/twproject.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/twproject.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/twproject.com\/blog\/#organization","name":"Twproject - Project Management Software","url":"https:\/\/twproject.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","contentUrl":"https:\/\/twproject.com\/blog\/wp-content\/uploads\/twroject-logo-m.png","width":331,"height":110,"caption":"Twproject - Project Management Software"},"image":{"@id":"https:\/\/twproject.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/a4b4732109ae58bf2062b8ada1d36608","name":"Twproject Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/twproject.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/728424669417891b94e17609737aa40230ec49ae6a8fe879ca8f6c0d014f6478?s=96&d=mm&r=g","caption":"Twproject Staff"},"sameAs":["twadmin"]}]}},"_links":{"self":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/10081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/comments?post=10081"}],"version-history":[{"count":1,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/10081\/revisions"}],"predecessor-version":[{"id":23887,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/posts\/10081\/revisions\/23887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media\/10093"}],"wp:attachment":[{"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/media?parent=10081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/categories?post=10081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/twproject.com\/blog\/wp-json\/wp\/v2\/tags?post=10081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}